9 am roll call.... well more like 9.20 because we all sort of arrived at different times at the boat ramp. Tom, Paul, Tim, Quinn and me travelled down with Tom's boat, Rick and Jason arrived just before us; Andrew, Aaron and 2 of his kids were already there. A few trips up and down the river (tide was out) and we had everything up at the hut. Scope of work was quite large:

Repair the roof (Tom & Andrew) - include installation of new chimney
Install the new window - Tim & Aaron
Spray the ponds - me, Paul, Rick & Jase.


New Chimney & Window

The day was hot but there was a decent breeze, but still Tom and Andy fried up on the roof. Rick and Jase powered through their work and me and Paul focussed on the heavy poa infestation especially between Park & Willow track and the Western edge of Bollocks. We trampled transverse lines through the crap and laid the spray on. Hopefully it has the desired effect. Lunch was called at 1 pm, Rick putting on a feed of venison sausages.

Venision Sausage in bread - on way up to men on roof


After a good day's work, all was completed. The new chimney looks brilliant, the new window is pretty good, and the Poa hopefully will wither under the intense spray program we applied. Paul and I saw a clutch of grey ducklings as well, a bit of a treat that you don't see everyday.

At 3 we pulled the pin at the ponds, tidying up and travelling to the landing took another hour. A big day's work out of the road, and really good to knock over some niggly problems that needed fixing.